CONSTRUCTION - ERECTION

Introduction
Commitment
Erection principles
ERECTION PROCESS
Quy trình

Introduction

• Erection is the final step in the construction process of steel and prefabricated steel plants. In this step, all components will be installed at the construction site and the joints bolted together.

• In addition to an elite technical installation and construction team with decades of experience, DTC also has advanced machinery and equipment systems to support and assist in the necessary construction phases to ensure the quality and progress of the project construction.

Document

To better understand the product & service solutions as well as the capabilities and service commitments of DTC Steel, we invite you to view our Company Profile.

Xem thêm

DTC's Commitment

Ensure accurate progress
Ensure accurate progress

With experience and support as well as modern machinery, the DTC team always ensures 100% of the committed schedule with the lowest error, minimizing costs for the investor.

Strict quality control
Strict quality control

DTC is committed to strict product quality inspection from processing to production to transportation to the construction site. Every structure built always meets the original design.

Safe and economical installation
Safe and economical installation

Owning a team of skilled workers, DTC always conducts the construction process according to the set regulations to minimize errors and loss of construction materials.

Work safety
Work safety

For the construction process to not have an unfortunate accident, safety work is carried out before each construction day for the day's execution plan and is closely monitored.

Warranty and maintenance
Warranty and maintenance

For customers to be assured of the quality of the work, we carry out warranty & maintenance of the project according to a particular cycle right after handing over the project to the customer to put it into operation.

Erection principles

The construction process of a pre-engineered steel structure must be carried out in the correct sequence to ensure consistency and professionalism and to limit the errors that can occur during construction.

Column and column support erection works

Install columns combined with wall purlins (if any) to tie the columns together. The column is neatly aligned, then proceed to erect the rafter.

The erection must be started with a space with wind bracing (column and roof bracing).

Erection of skeleton frame

Erection of the skeleton frame inside and then proceed to Erection of the skeleton frame outside (follow the moving path of the crane - see attached construction organization drawing).

Fix the two mounting brackets at the wind-bracing position before erecting the adjacent frame. This process is translated for subsequent frames.

Complete installation of wall panel

Regularly use chalk or string to position or mark landmarks to level the slabs.
When walking on the roof, you must put your foot in the lower wave (sound wave), if you step on the high wave, it will cause the tole zone to collapse, which can cause dents or punctures, causing leaks.
Do not walk up to bright tole panels.

ERECTION PROCESS

The construction process of a pre-engineered steel structure must be carried out in the correct sequence to ensure consistency and professionalism and to limit the errors that can occur during construction.

SURVEYING AND INFRASTRUCTURE CONSTRUCTION WORKS
PRESSED PILE CONSTRUCTION WORKS (IF ANY)
FOUNDATION - PRE-ANCHOR BOLTED CONSTRUCTION WORKS
COLUMN AND COLUMN SUPPORT ERECTION WORKS
FRAME, PURLIN, BRACING ROOF ERECTION WORKS
ERECTION OF SKELETON FRAME
COMPLETE INSTALLATION OF WALL PANEL
ROOF PANEL - ROOF MONITOR CONSTRUCTION
FLOORING CONSTRUCTION WORK
ELECTRICAL (M&E) SYSTEM CONSTRUCTION WORK
DECORATION CONSTRUCTION WORK

Projects

Industrial buildings
Commercial buildings
Civil works
Public construction
Other works

Consultant Now

Choose file
CÔNG TY TNHH TEDFAST
CH003, An Loc 02 Building, No. 02 Vu Tong Phan, An Phu Ward, Thu Duc City, HCMC
0902 479 793
tedfast@tedfast.vn
Thứ 2 - Thứ 7: 8:00 - 18:00
Thông tin
Kết nối
Bản đồ
© Designed & Developed by TEDFAST